Installation Ready

SAE
GETTING INSTALL READY

Help us prepare for your installation

Please provide the information and photos below. Clear photos help our team reduce delays, avoid surprises and prepare the right equipment before installation day.

1

Customer details

Tell us who the submission relates to.

2

Meterboard photos *

Take one full photo of the inside of your meterboard, plus clear close-ups of the switches, labels and meter.

Example for Meterboard photos
Minimum 1, maximum 8 file(s). Images and phone camera photos accepted.
3

Meterboard location *

Stand about 1.5 metres away and take a photo showing the meterboard and the surrounding wall.

Example for Meterboard location
Minimum 1, maximum 4 file(s). Images and phone camera photos accepted.
4

Proposed inverter or battery location *

Take a clear photo of the wall or area discussed with your energy consultant.

Example for Proposed inverter or battery location
Minimum 1, maximum 5 file(s). Images and phone camera photos accepted.
5

Roof photos *

Take clear photos of the roof from safe ground-level positions. Include each visible roof face and any nearby trees or obstructions.

Minimum 1, maximum 10 file(s). Images and phone camera photos accepted.
6

Front of house *

Take one photo showing the full front of the property and access from the street.

Example for Front of house
Minimum 1, maximum 3 file(s). Images and phone camera photos accepted.
7

Electricity bill *

Upload a PDF or take clear photos of pages 1 and 2 of your latest electricity bill.

Example for Electricity bill
Minimum 1, maximum 4 file(s). Images and PDF files accepted.

Share This Post With Others!

Related Post

Scroll to Top